Recommendations

Mode
Issued Date

1711 results found. Showing page 140 of 172.

Rec. Number Issued Sort ascending Inquiry Recipient Recommendation
065/94 Rail RO-1993-128 NZ Rail For resetting the alarms at Eltham, to obviate the need for the Locomotive Engineers to leave the cab to reset them.
068/94 Rail RO-1993-128 NZ Rail They take positive steps to encourage a safety culture among Locomotive Engineers and other operating staff in which events which are not understood…
057/94 Rail RO-1994-117 NZ Rail Keep the ban on the use of the viewing platform in force until: a review of all aspects of the design, inspection and maintenance of the safety rails…
060/94 Rail RO-1994-117 NZ Rail Ensure the review of the design of the safety rails considers if a secondary safeguard is required where the concertina weather protection is not…
063/94 Rail RO-1994-117 NZ Rail Define the person (or persons) upon whom the responsibility rests to ensure that the execution of any remedial repair or redesign work is carried out…
040/94 Rail RO-1993-128 NZ Rail They review the wording of clauses 3.8.4 and 3.8.5 of section L4 of the Working Timetable with a view to explaining clearly the situation which arose…
066/94 Rail RO-1993-128 NZ Rail They investigate the practicability of introducing an operating procedure that, when trains are to cross at Eltham, requires one train to stop…
050/94 Rail RO-1994-108 LTSA advise all operators of steam locomotives of the need to use borosilicate glass tubes in sight gauges, with all such gauges to have a safety screen…
069/94 Rail RO-1994-109 NZ Rail Consideration be given to providing a clip in an illuminated position near the Locomotive Engineer which would enable him to have the Track Warrant…
070/94 Rail RO-1994-109 NZ Rail The practice of issuing Track Warrants prior to their immediate need, be reviewed to minimise the potential for the suppression of the Warrant's…

1711 results found. Showing page 140 of 172.