Conduct a review, in consultation with RCCNZ, to ensure that maritime rescue plans are in place and put into practice where appropriate, for areas of increased water-based activity nationwide.
Issue date:engineering standards consistent with world standard practice are identified and adhered to manufacturers’ inspection, repair and maintenance instructions are documented and followed safety critical components are identified and documented.
Issue date:Approach the local air traffic service provider and local User Group to discuss the justification and acceptability of developing standardised procedures for the co-ordination of aircraft flying through Kawarau Gorge.
Issue date:include the appropriate Regional Council Harbourmaster in the consultation and approval process when navigational marks are installed, altered or removed in harbours under their jurisdiction.
Issue date:On 23 February 2018 the Commission recommended that, given the potentially harsh and sensitive environment in the sub-Antarctic islands and the likelihood that shipping activity will increase in future, the Director-General of the Department of Conservation appoint a suitably qualified person to manage the safety of navigation in the sub-Antarctic islands.
Issue date:do not allow train controllers to be re-certified unless they have undergone the required audits and assessments defined in Tranz Rail’s procedures within the prescribed timeframes.
Issue date:Give increased consideration to the need for procedures and supervision which take account of the competency and experience of staff employed in all safety critical areas to ensure effective quality control.
Issue date:ensure that staff are available in the train control centre to assist the train controller by liasing with Tranz Metro when suburban train services are disrupted
Issue date:The Commission has made a recommendation to Wartsila that it take further steps to help ensure users of its RT-Flex engines are fully aware of all the effects of the IMO sulphur cap and its operational effect on ICU performance, maintenance and lifetime service.
Issue date:Operators and drivers of large road vehicles should have quick access to the emergency telephone number of the National Train Control Centre for alerting the train controller if there is any issue with their vehicles that could compromise the rail corridor. The Commission recommends that the Chief Executive of NZ Transport Agency advise other operators of large road vehicles that their drivers should carry the train control emergency telephone number so that they can alert the train controller in any similar situation
Issue date:Make it mandatory that instructors exchange relevant information about trainee pilots, in addition to log book entries, before they can continue with the training of a pilot from a different company or school.
Issue date:Introduce a system on all Sanford vessels for recording on board, all operational, safety and maintenance checks/tasks carried out by the crew or Sanford's shore staff. A work record book with signed entries each time a task or check is completed would serve this purpose.
Issue date: