Tranz Rail
Text
Review the design and operation of the signalling and integrated level crossing protection at Trentham for up trains, with a view to reducing the possibility of a stopping train with correct route setting and signal clearance receiving an initial red indication on Signal 29 after departing from Heretaunga.
Reply Text
The review and intent of safety recommendation 080/97 has already been commenced.