Skip to main content
arrow_left_alt Recommendations

Recommendation 080/97

Rail

Review the design and operation of the signalling and integrated level crossing protection at Trentham for up trains, with a view to reducing the possibility of a stopping train with correct route setting and signal clearance receiving an initial red indication on Signal 29 after departing from Heretaunga.