077/05

Recommendation Date
Recipient Name
ONTRACK
Text
conduct a workload analysis at all signal boxes in the Auckland area, including train control, to ensure adequate resourses are available to meet existing and projected increased passenger traffic
Reply Text
ONTRACK accepts this recommendation. A time for a projected workload analysis to be completed cannot be established until the detail of future timetable changes has been determined and advised to ONTRACK through the timetable committee.
Related Investigation(s)