046/99

Recommendation Date
Recipient Name
Tranz Rail
Text
Implements a track inspection regime of a standard and to a frequency that:
• identifies and protects predictable weak spots
• detects repeated non-standard practices and that the inspection requirements are formalised and adhered to.
Reply Text
Tranz Rail accepts safety recommendation 046/99. Your recommendation, however, does not add anything new to the existing process. The ongoing management of the system requires that these items be continually reviewed and revisited. Changes as a result of review have already been made to these processes and further review of the entire inspection regime is continuing. As such we find that the recommendation is already in place.
Related Investigation(s)