Recommendation Date
Recipient Name
Tranz Rail
Text
quantify lengths of CWR that have an unknown neutral temperature and ensure they are assessed, and protected where appropriate until destressing can be arranged.
[SR repeated in report 02-104: 3 separate track buckle occurrences on the South Island coal route during the summer of 2001/2002.]
[SR repeated in report 02-104: 3 separate track buckle occurrences on the South Island coal route during the summer of 2001/2002.]
Reply Text
Tranz Rail accept this recommendation. These sites have been identified during a recent survey carried out to assist preparation of the de-stressing programme and to reconfirm sits requiring "heat 40" speed restrictions.
Related Investigation(s)