Recommendations

Mode
Issued Date

1742 results found. Showing page 119 of 175.

Rec. Number Issued Sort ascending Inquiry Recipient Recommendation
059/98 Rail RO-1998-106 Tranz Rail Reviews the adequacy of compliance monitoring of wagon loading.
054/98 Rail RO-1998-109 Tranz Rail Reviews the adequacy of existing incident reporting procedures to identify recurring problems and initiate appropriate follow up action.
060/98 Rail RO-1998-106 Tranz Rail Ensures standards and inspection procedures are in place to prevent the use of strops and other restraining devices which are below desirable…
055/98 Rail RO-1998-109 Tranz Rail Reviews the adequacy of standards and procedures relating to the operation of existing sidings on steep grades, and the installation of new sidings…
040/98 Marine MO-1998-201 Port Nelson Implements a system of regular structured meetings of all pilots and tug masters operating in the port, to foster good communication and a shared…
074/98 Marine MO-1998-201 Oldendorff Includes in the International Safety Management system for the T.A. Explorer, the requirement for masters to plan each passage from berth to berth.
051/98 Marine MO-1997-208 S.E.M.T. Pielstick uses the most prudent and practical method available to them to disseminate information to owners of PC3 engines regarding modifications to the…
042/98 Marine MO-1998-201 Port Nelson Implements a system of familiarisation in tug operations for maritime pilots, as required.
075/98 Marine MO-1998-201 Oldendorff Ensures that the T.A. Explorer, and other vessels belonging to the company, have an appropriate pilot information card.
048/98 Rail RO-1997-114 Tranz Rail Take steps to ensure that before introducing operational innovations such as the Otira Tunnel ventilation system that adequate structured risk…

1742 results found. Showing page 119 of 175.