Recommendations
1742 results found. Showing page 119 of 175.
Rec. Number | Issued Sort ascending | Inquiry | Recipient | Recommendation |
---|---|---|---|---|
059/98 Rail | RO-1998-106 | Tranz Rail | Reviews the adequacy of compliance monitoring of wagon loading. | |
054/98 Rail | RO-1998-109 | Tranz Rail | Reviews the adequacy of existing incident reporting procedures to identify recurring problems and initiate appropriate follow up action. | |
060/98 Rail | RO-1998-106 | Tranz Rail | Ensures standards and inspection procedures are in place to prevent the use of strops and other restraining devices which are below desirable… | |
055/98 Rail | RO-1998-109 | Tranz Rail | Reviews the adequacy of standards and procedures relating to the operation of existing sidings on steep grades, and the installation of new sidings… | |
040/98 Marine | MO-1998-201 | Port Nelson | Implements a system of regular structured meetings of all pilots and tug masters operating in the port, to foster good communication and a shared… | |
074/98 Marine | MO-1998-201 | Oldendorff | Includes in the International Safety Management system for the T.A. Explorer, the requirement for masters to plan each passage from berth to berth. | |
051/98 Marine | MO-1997-208 | S.E.M.T. Pielstick | uses the most prudent and practical method available to them to disseminate information to owners of PC3 engines regarding modifications to the… | |
042/98 Marine | MO-1998-201 | Port Nelson | Implements a system of familiarisation in tug operations for maritime pilots, as required. | |
075/98 Marine | MO-1998-201 | Oldendorff | Ensures that the T.A. Explorer, and other vessels belonging to the company, have an appropriate pilot information card. | |
048/98 Rail | RO-1997-114 | Tranz Rail | Take steps to ensure that before introducing operational innovations such as the Otira Tunnel ventilation system that adequate structured risk… |
1742 results found. Showing page 119 of 175.