133/00 Rail RO-2000-108 Tranz Rail develop and implement a support programme for newly qualified entrants to jobs in safety-critical areas, such as the shunting environment, focusing…
027/02 Marine MO-2001-214 Tranz Rail Conduct a risk assessment of navigation in confined waters and upgrade the passage plans to make use of techniques such as monitored turns and…
038/96 Rail RO-1995-122 Tranz Rail Give priority to developing a suitable solid wheel option to replace tyred wheels on Electric Multiple units.
080/99 Rail RO-1999-121 Tranz Rail Introduce operating procedures for Tranz Rail staff and customers who move wagons without using rail mounted vehicles, or load or unload wagons,…
077/01 Rail RO-2001-113 Tranz Rail Either immediately prohibit the public use of the level crossing in accordance with Clause 1(d) of the Deed of Grant or, if public use is to continue…
007/00 Rail RO-1999-101 Tranz Rail Continue the inspection of the type 14 bogie wagon fleet on a systematic basis to ensure the integrity of the brake beams until such time as the…
134/00 Rail RO-2000-108 Tranz Rail develop and implement procedures to ensure that personnel with less than 6 months experience in roles in safety-critical areas, such as the shunting…
053/03 Rail RO-2003-103 Tranz Rail Ensure that the supervision of on-the-job training of train controllers in training or trainee train controllers only be undertaken by qualified…
014/00 Marine MO-1999-209 Tranz Rail critically review each rescue boat and its launching arrangement in the Interisland Line fleet and ensure that the crew are afforded a level of…
039/96 Rail RO-1995-122 Tranz Rail Review the periodicity and suitability of pit inspection to detect loose tyres on Electric Multiple Units before lateral movement on the wheel is…