Recommendations
1711 results found. Showing page 107 of 172.
Rec. Number | Issued Sort ascending | Inquiry | Recipient | Recommendation |
---|---|---|---|---|
080/99 Rail | RO-1999-121 | Tranz Rail | Introduce operating procedures for Tranz Rail staff and customers who move wagons without using rail mounted vehicles, or load or unload wagons,… | |
078/99 Rail | RO-1999-121 | Tranz Rail | Undertake an immediate inspection of all wagons utilizing this type of handgrip and remove from service those showing evidence of straightening and… | |
081/99 Rail | RO-1999-121 | Tranz Rail | Introduce standards for design, inspection and repair of safety critical components which ensure they remain fit for purpose in the intended… | |
016/99 Rail | RO-1999-103 | Tranz Rail | Urgently review the suitability of, and compliance with, procedures ensuring safe operation of multiple shunts between Wellington yard and the Ferry… | |
017/99 Rail | RO-1999-103 | Tranz Rail | Restrict the speed on road E6 to that compatible with the line of sight available. | |
044/99 Rail | RO-1999-107 | Tranz Rail | Amend existing code instructions and training procedures for the operation of remote control locomotives to ensure they include: • a… |
|
065/99 Rail | RO-1999-111 | Tranz Rail | Take steps to ensure propelling movements are carried out from a safe position to control movements by line of sight, including the use of a second… | |
068/99 Rail | RO-1999-111 | Tranz Rail | Reassess the desirability of permitting shunting staff to ride on the deck of certain wagons, and in particular for RCO's to control shunt… | |
045/99 Rail | RO-1999-107 | Tranz Rail | Consolidate and clarify procedures to avoid conflicting movements in the Auckland Freight Centre and include procedures for the dispatch of trains. | |
066/99 Rail | RO-1999-111 | Tranz Rail | Reinforce the training and increase the compliance monitoring of RCO's to ensure they are positioned and operate in such a manner that a… |
1711 results found. Showing page 107 of 172.