Recommendations

Mode
Issued Date

1711 results found. Showing page 107 of 172.

Rec. Number Issued Sort ascending Inquiry Recipient Recommendation
080/99 Rail RO-1999-121 Tranz Rail Introduce operating procedures for Tranz Rail staff and customers who move wagons without using rail mounted vehicles, or load or unload wagons,…
078/99 Rail RO-1999-121 Tranz Rail Undertake an immediate inspection of all wagons utilizing this type of handgrip and remove from service those showing evidence of straightening and…
081/99 Rail RO-1999-121 Tranz Rail Introduce standards for design, inspection and repair of safety critical components which ensure they remain fit for purpose in the intended…
016/99 Rail RO-1999-103 Tranz Rail Urgently review the suitability of, and compliance with, procedures ensuring safe operation of multiple shunts between Wellington yard and the Ferry…
017/99 Rail RO-1999-103 Tranz Rail Restrict the speed on road E6 to that compatible with the line of sight available.
044/99 Rail RO-1999-107 Tranz Rail Amend existing code instructions and training procedures for the operation of remote control locomotives to ensure they include:
• a…
065/99 Rail RO-1999-111 Tranz Rail Take steps to ensure propelling movements are carried out from a safe position to control movements by line of sight, including the use of a second…
068/99 Rail RO-1999-111 Tranz Rail Reassess the desirability of permitting shunting staff to ride on the deck of certain wagons, and in particular for RCO's to control shunt…
045/99 Rail RO-1999-107 Tranz Rail Consolidate and clarify procedures to avoid conflicting movements in the Auckland Freight Centre and include procedures for the dispatch of trains.
066/99 Rail RO-1999-111 Tranz Rail Reinforce the training and increase the compliance monitoring of RCO's to ensure they are positioned and operate in such a manner that a…

1711 results found. Showing page 107 of 172.