Recommendations

Mode
Issued Date

1711 results found. Showing page 77 of 172.

Rec. Number Issued Sort ascending Inquiry Recipient Recommendation
005/03 Marine MO-2002-206 South Port NZ Review the company’s procedure manuals with the purpose of ensuring that there is sufficient information available for personnel responsible for…
003/03 Marine MO-2002-206 South Port NZ Promote the bridge resource management concepts by requiring pilots to use them at every opportunity.
001/03 Marine MO-2002-206 South Port NZ Evaluate South Port’s pilot/tug master training programme including the use of the simulator to determine the most efficient method of ensuring that…
004/03 Marine MO-2002-206 South Port NZ Promote resource management concepts throughout the operational staff of the port.
010/03 Marine MO-2002-208 Holcim NZ Instigate regular monitoring and logging of the critical operating oil pressures and flows of the controllable pitch propeller system under…
011/03 Marine MO-2002-208 Holcim NZ Ensure that all the crew of the Westport who are responsible for the operation, maintenance and monitoring of the controllable pitch propeller system…
060/02 Marine MO-2002-201 Eastland Port Investigate and improve the mooring system so that it is effective for the size and type of vessels expected to utilise the port. Such improvement…
063/02 Marine MO-2002-201 Eastland Port Review the limiting dimensions of ships allowed to use the port to better reflect the PIANC guidelines.
066/02 Marine MO-2002-201 Gisborne DC (F) Ensure that the duly appointed harbourmaster for the Port of Gisborne is employed on terms and conditions which enable him or her to properly fulfil…
069/02 Marine MO-2002-201 Gisborne Pilot Prepare and use a comprehensive pilotage passage plan. The plan should be readily understandable and have sufficient detail to inform visiting ship’…

1711 results found. Showing page 77 of 172.