Recommendations

Mode
Issued Date

1719 results found. Showing page 52 of 172.

Rec. Number Issued Sort ascending Inquiry Recipient Recommendation
021/06 Rail RO-2004-132 ONTRACK inspect all stirrup connections at regular intervals and replace components that exhibit excess corrosion.
022/06 Rail RO-2004-132 Toll NZ Consolidated reinforce with operating staff the need to remain on the train in situations that could put their own and the lives of passengers at risk.
020/06 Aviation AO-2006-002 CAA require all operators of the Piper PA 23-250 Aztec aeroplanes that are subject to AD DCA/PA-23/155A, to replace the gear selector lever with the new…
019/06 Rail RO-2005-126 ONTRACK review the network protection at operationally critical locations such as but not limited to North and South Junctions.
012/06 Marine MO-2005-210 Real Journeys In conjunction with the engine control manufacturer, ensure that each of the company’s vessels is configured for optimum operation by checking their…
015/06 Marine MO-2005-210 Real Journeys Carry out a risk assessment of the Master’s workload on each of the company’s vessels with a view to reviewing the minimum crewing documents to…
018/06 Marine MO-2005-210 MNZ Review Maritime New Zealand’s internal practices and procedures for assessing and approving applications for the issuance or renewal of Minimum…
013/06 Marine MO-2005-210 Real Journeys Carry out a full engine trial on the Milford Mariner, and any other of the company’s vessels for which full engine trial data is not available or…
016/06 Marine MO-2005-210 Real Journeys Establish a policy that all staff undergoing training are properly supervised.
011/06 Marine MO-2005-210 Real Journeys Establish quality assurance procedures within Real Journeys to ensure safety critical operational defects are properly addressed.

1719 results found. Showing page 52 of 172.