Recommendations

Mode
Issued Date

1705 results found. Showing page 21 of 171.

Rec. Number Issued Inquiry Recipient Sort ascending Recommendation
047/01 Rail RO-2000-123 Tranz Rail conduct a full audit of the Auckland train control radio system to ensure it meets required standards for communication between train controllers and…
016/97 Rail RO-1996-115 Tranz Rail Review procedures for compliance monitoring of shunting staff to place more emphasis on an increased level of "unannounced" observation of…
046/99 Rail RO-1998-116 Tranz Rail Implements a track inspection regime of a standard and to a frequency that:
• identifies and protects predictable weak spots
•…
128/00 Rail RO-2000-101 Tranz Rail develop and introduce a more intensive audit and assessment procedure for new train controllers for their first 12 months in the position,…
022/03 Rail RO-2002-116 Tranz Rail Provide train controllers with documentation clearly defining and illustrating the boundaries of radio repeaters in use on the respective routes of…
048/01 Rail RO-2000-123 Tranz Rail ensure that staff are available in the train control centre to assist the train controller by liasing with Tranz Metro when suburban train services…
017/97 Rail RO-1996-115 Tranz Rail Formally structure compliance monitoring for newly-appointed staff to include input from experienced shunting staff where appropriate.
082/99 Rail RO-1998-117 Tranz Rail Ensure that all Circuit Marker Posts marking the track circuit approaching the Facing Points Indicators in Track Warrant areas are maintained in…
093/00 Rail RO-2000-102 Tranz Rail Ensure that trackside growth and the location of poles and other structures do not interfere with necessary minimum signal sighting distances
006/03 Rail RO-2002-118 Tranz Rail Ensure that the following initial training and certification, new entrant controllers do not commence training on another train control desk until…

1705 results found. Showing page 21 of 171.