Recommendations
1742 results found. Showing page 110 of 175.
Rec. Number | Issued Sort ascending | Inquiry | Recipient | Recommendation |
---|---|---|---|---|
079/99 Rail | RO-1999-121 | Tranz Rail | Take immediate steps to control the weld repair of safety critical components to recognised standards to ensure the integrity of the original… | |
080/99 Rail | RO-1999-121 | Tranz Rail | Introduce operating procedures for Tranz Rail staff and customers who move wagons without using rail mounted vehicles, or load or unload wagons,… | |
078/99 Rail | RO-1999-121 | Tranz Rail | Undertake an immediate inspection of all wagons utilizing this type of handgrip and remove from service those showing evidence of straightening and… | |
081/99 Rail | RO-1999-121 | Tranz Rail | Introduce standards for design, inspection and repair of safety critical components which ensure they remain fit for purpose in the intended… | |
016/99 Rail | RO-1999-103 | Tranz Rail | Urgently review the suitability of, and compliance with, procedures ensuring safe operation of multiple shunts between Wellington yard and the Ferry… | |
017/99 Rail | RO-1999-103 | Tranz Rail | Restrict the speed on road E6 to that compatible with the line of sight available. | |
064/99 Rail | RO-1999-111 | Tranz Rail | Liase with CHH and incorporate procedures in the "Railway Operating Plan" which control CHH operations (and its subsidiaries) adjacent to… | |
067/99 Rail | RO-1999-111 | Tranz Rail | Amend existing code instructions and training procedures for the operation of remote control locomotives to ensure they include a definition of what… | |
044/99 Rail | RO-1999-107 | Tranz Rail | Amend existing code instructions and training procedures for the operation of remote control locomotives to ensure they include: • a… |
|
065/99 Rail | RO-1999-111 | Tranz Rail | Take steps to ensure propelling movements are carried out from a safe position to control movements by line of sight, including the use of a second… |
1742 results found. Showing page 110 of 175.