Recommendations

Mode
Issued Date

1719 results found. Showing page 108 of 172.

Rec. Number Issued Sort ascending Inquiry Recipient Recommendation
078/99 Rail RO-1999-121 Tranz Rail Undertake an immediate inspection of all wagons utilizing this type of handgrip and remove from service those showing evidence of straightening and…
016/99 Rail RO-1999-103 Tranz Rail Urgently review the suitability of, and compliance with, procedures ensuring safe operation of multiple shunts between Wellington yard and the Ferry…
017/99 Rail RO-1999-103 Tranz Rail Restrict the speed on road E6 to that compatible with the line of sight available.
043/99 Rail RO-1999-107 Tranz Rail Reinforce the training and increase the compliance monitoring of remote control operators to ensure they are positioned and operate in such a manner…
064/99 Rail RO-1999-111 Tranz Rail Liase with CHH and incorporate procedures in the "Railway Operating Plan" which control CHH operations (and its subsidiaries) adjacent to…
067/99 Rail RO-1999-111 Tranz Rail Amend existing code instructions and training procedures for the operation of remote control locomotives to ensure they include a definition of what…
044/99 Rail RO-1999-107 Tranz Rail Amend existing code instructions and training procedures for the operation of remote control locomotives to ensure they include:
• a…
065/99 Rail RO-1999-111 Tranz Rail Take steps to ensure propelling movements are carried out from a safe position to control movements by line of sight, including the use of a second…
068/99 Rail RO-1999-111 Tranz Rail Reassess the desirability of permitting shunting staff to ride on the deck of certain wagons, and in particular for RCO's to control shunt…
045/99 Rail RO-1999-107 Tranz Rail Consolidate and clarify procedures to avoid conflicting movements in the Auckland Freight Centre and include procedures for the dispatch of trains.

1719 results found. Showing page 108 of 172.