Recommendations
1705 results found. Showing page 163 of 171.
Rec. Number | Issued | Inquiry | Recipient Sort descending | Recommendation |
---|---|---|---|---|
003/96 Rail | RO-1996-101 | Tranz Rail | Introduce procedures governing the issue of track warrants to limit the length over which a track warrant is issued. | |
054/98 Rail | RO-1998-109 | Tranz Rail | Reviews the adequacy of existing incident reporting procedures to identify recurring problems and initiate appropriate follow up action. | |
017/02 Rail | RO-2002-101 | Tranz Rail | Take immediate steps to institute an inspection/protection regime at the south abutment of Bridge 57 over the Rangitata River which: … |
|
054/02 Rail | RO-2002-101 | Tranz Rail | Introduce procedures into the leave programmes for track staff, including length gangers and track maintainers, to ensure adequate qualified staff… | |
075/97 Rail | RO-1997-109 | Tranz Rail | Take appropriate action to reduce the possibility of similar incidents occurring at any other localities where adjacent signals capable of giving… | |
017/99 Rail | RO-1999-103 | Tranz Rail | Restrict the speed on road E6 to that compatible with the line of sight available. | |
006a/04 Rail | RO-2003-104 | Tranz Rail | Ensure all operating staff understand the principles of crew resource management and that all train crew ... attend formal crew resource management… | |
004/96 Rail | RO-1996-101 | Tranz Rail | Introduce procedures governing the issue of track warrants to require a Locomotive Engineer taking control of the train after a crew change to have… | |
055/98 Rail | RO-1998-109 | Tranz Rail | Reviews the adequacy of standards and procedures relating to the operation of existing sidings on steep grades, and the installation of new sidings… | |
057/98 Rail | RO-1998-109 | Tranz Rail | Takes immediate steps to review the security of the main line adjacent to the Hutt Timber siding at Tokoroa and initiate action to protect the main… |
1705 results found. Showing page 163 of 171.