004/96

Recommendation Date
Recipient Name
Tranz Rail
Text
Introduce procedures governing the issue of track warrants to require a Locomotive Engineer taking control of the train after a crew change to have to "accept" an open track warrant with the same "double check" procedures associated with the issue of new track warrants.
Reply Text
[See respondent's other comments]
Related Investigation(s)