Recommendations

Mode
Issued Date

1705 results found. Showing page 153 of 171.

Rec. Number Issued Inquiry Recipient Sort descending Recommendation
045/96 Rail RO-1996-108 Tranz Rail Ensure all other axles on the Silver Ferns are similarly treated when next in the workshop, and that all spare axles are similarly treated before…
067/00 Rail RO-1999-125 Tranz Rail ensure that all relevant Rule clauses and sub-clauses are specified in the "Work By Rule" section of the information bulletin.
037/98 Rail RO-1998-104 Tranz Rail Reviews the training, knowledge, and experience of Track and Structures Managers, Gangers, and those required to act in such positions, in respect to…
066/99 Rail RO-1999-111 Tranz Rail Reinforce the training and increase the compliance monitoring of RCO's to ensure they are positioned and operate in such a manner that a…
023/01 Rail RO-2000-118 Tranz Rail quantify the effectiveness of heat sensors at current settings to protect areas of weakness in hot weather, and if necessary lower the trigger levels…
046/96 Rail RO-1996-108 Tranz Rail Review the procedures during programmed wheel replacement to include monitoring of the condition of the axle surface and the effectiveness of…
098/98 Rail RO-1998-112 Tranz Rail Issue instructions requiring 3.7 m logs to be suitably restrained by strops or chains when transported by standard log wagons.
046/00 Rail RO-1999-127 Tranz Rail prohibit staff members from riding motor cycles for any time they are required to maintain safe line of sight for a propelling movement when shunting…
016/03 Rail RO-2002-116 Tranz Rail Introduce procedures that define permanent, pre-determined call locations on routes under track warrant control, from where locomotive engineers must…
038/98 Rail RO-1998-104 Tranz Rail Ensures systems are in place to assess the competency of any appointed or acting Track and Structures Manager or Ganger who make such decisions.

1705 results found. Showing page 153 of 171.