Recommendations

Mode
Issued Date

1711 results found. Showing page 140 of 172.

Rec. Number Issued Sort ascending Inquiry Recipient Recommendation
041/94 Rail RO-1993-128 NZ Rail They review the methods of section familiarisation training, with a view to establishing syllabi and examinations that are documented and able to be…
067/94 Rail RO-1993-128 NZ Rail They reiterate to Locomotive Engineers that "crashing" alarms to operate them is not an acceptable practice, and that it may lead to…
059/94 Rail RO-1994-117 NZ Rail When reviewing the design of the safety rails (or chains or strops as appropriate) take into account the spacing and layout of the safety rails, and…
062/94 Rail RO-1994-117 NZ Rail Define the person (or persons) upon whom the responsibility for the inspection of safety equipment and safety features on carriages rests.
065/94 Rail RO-1993-128 NZ Rail For resetting the alarms at Eltham, to obviate the need for the Locomotive Engineers to leave the cab to reset them.
068/94 Rail RO-1993-128 NZ Rail They take positive steps to encourage a safety culture among Locomotive Engineers and other operating staff in which events which are not understood…
057/94 Rail RO-1994-117 NZ Rail Keep the ban on the use of the viewing platform in force until: a review of all aspects of the design, inspection and maintenance of the safety rails…
060/94 Rail RO-1994-117 NZ Rail Ensure the review of the design of the safety rails considers if a secondary safeguard is required where the concertina weather protection is not…
069/94 Rail RO-1994-109 NZ Rail Consideration be given to providing a clip in an illuminated position near the Locomotive Engineer which would enable him to have the Track Warrant…
070/94 Rail RO-1994-109 NZ Rail The practice of issuing Track Warrants prior to their immediate need, be reviewed to minimise the potential for the suppression of the Warrant's…

1711 results found. Showing page 140 of 172.