Recommendations

Mode
Issued Date

1705 results found. Showing page 145 of 171.

Rec. Number Issued Inquiry Recipient Sort descending Recommendation
068/05 Rail RO-2004-116 Toll NZ Consolidated take steps to minimise the quantity of airborne dist particles being circulated in the generator enclosure of similar AL passenger cars.
069/05 Rail RO-2004-116 Toll NZ Consolidated check all generator units similar to AL2073 to ensure that the cooling airflow is adequate and unrestricted within the generator enclosure around all…
032/04 Rail RO-2003-107 Toll NZ Consolidated Ensure that the rubber door seals used on the bi-parting doors of passenger cars are of a material type and profile that allows trapped limbs to be…
070/05 Rail RO-2004-116 Toll NZ Consolidated include in the 12-monthly C-check an additional test to establish that adequate cooling has been achieved within all areas of the generator enclosure…
058/04 Rail RO-2003-109 Toll NZ Consolidated Establish an inspection procedure and criteria for acceptance or rejection of individual DMU driveshafts in service with the assistance of the…
101/05 Rail RO-2005-115 Toll NZ Consolidated with the trend towards fixed passenger train consists, investigate compliance with, and the robustness of, present procedures for the checking of…
059/04 Rail RO-2003-109 Toll NZ Consolidated Establish installation and maintenance standards for driveshafts and instruct all relevant maintenance staff in their use.
060/04 Rail RO-2003-109 Toll NZ Consolidated Revise the design of the safety stirrup to better constrain the driveshaft and reduce the risk of injury in the event of a driveshaft failure.
091/05 Rail RO-2005-117 Toll NZ Consolidated ensure that the alertness management training programme includes provision for ongoing refresher training
030/06 Rail RO-2005-119 Toll NZ Consolidated Enhance existing air brake and handbrake procedures to include:

• a minima number of handbrakes to be applied proportional to the…

1705 results found. Showing page 145 of 171.