Recommendations

Mode
Issued Date

1705 results found. Showing page 145 of 171.

Rec. Number Issued Inquiry Recipient Sort descending Recommendation
070/05 Rail RO-2004-116 Toll NZ Consolidated include in the 12-monthly C-check an additional test to establish that adequate cooling has been achieved within all areas of the generator enclosure…
058/04 Rail RO-2003-109 Toll NZ Consolidated Establish an inspection procedure and criteria for acceptance or rejection of individual DMU driveshafts in service with the assistance of the…
101/05 Rail RO-2005-115 Toll NZ Consolidated with the trend towards fixed passenger train consists, investigate compliance with, and the robustness of, present procedures for the checking of…
059/04 Rail RO-2003-109 Toll NZ Consolidated Establish installation and maintenance standards for driveshafts and instruct all relevant maintenance staff in their use.
060/04 Rail RO-2003-109 Toll NZ Consolidated Revise the design of the safety stirrup to better constrain the driveshaft and reduce the risk of injury in the event of a driveshaft failure.
091/05 Rail RO-2005-117 Toll NZ Consolidated ensure that the alertness management training programme includes provision for ongoing refresher training
030/06 Rail RO-2005-119 Toll NZ Consolidated Enhance existing air brake and handbrake procedures to include:

• a minima number of handbrakes to be applied proportional to the…
061/04 Rail RO-2003-109 Toll NZ Consolidated Individually identify all driveshafts on the DMU fleet so that their maintenance and service history can be recorded and tracked.
032/06 Rail RO-2005-118 Toll NZ Consolidated include within existing inspection procedures for bogie side frames a requirement that staff, as far as each level of inspection allows, check for…
066/04 Rail RO-2003-110 Toll NZ Consolidated Ensure that in all cases of a train parting, the whole train is inspected before any attempt is made to couple up and move off.

1705 results found. Showing page 145 of 171.