Recommendation Date
              Recipient Name
              ONTRACK
          Text
              review existing signalling and interlocking arrangements and operating procedures at Single Line Automatic Signalling crossing stations on the Midland Line, with a view to introducing enhanced operating practices or engineering modifications to reduce the risk of collision resulting from the overrunning of a signal at stop.
          Reply Text
              ONTRACK accepts this recommendation.  This review should be completed in the third quarter of 2006.
          Related Investigation(s)
          
      