109/05

Recommendation Date
Recipient Name
ONTRACK
Text
review existing signalling and interlocking arrangements and operating procedures at Single Line Automatic Signalling crossing stations on the Midland Line, with a view to introducing enhanced operating practices or engineering modifications to reduce the risk of collision resulting from the overrunning of a signal at stop.
Reply Text
ONTRACK accepts this recommendation. This review should be completed in the third quarter of 2006.
Related Investigation(s)