Develop and introduce a checksheet for use by train controllers when dealing with disabled trains, to include such detail as:
- the exact metrage of the disabled train and how it was established
- the length of the disabled train
- the recognised points between which it was disabled
- the end from which relief is to come
- the actions taken to protect the disabled train
- confirmation that the intended recovery action was discussed with the locomotive engineers of the disabled train and the relief train