Remove the present substantial concrete gate posts on the extended centre line of runway 05 and replace them with a light weight frangible structure to reduce the hazard to overrunning aircraft.
Issue date:Ensure that operators are reminded of the requirement to have the equipment used approved by the Ministry of Transport.
Issue date:That no further permission be granted for operations from the Rotomahana Block Airstrip, until the thistles have been removed.
Issue date:Cancel any approvals for human sling loads which were issued prior to the promulgation of CASO 20.
Issue date:Institute a schedule of routine inspections for the equipment once it has been approved.
Issue date:Review the procedures in use for releasing the chain from the aircraft if it should become snagged.
Issue date:He require the "brace for impact" position to be included as part of the pre-flight passenger briefing by demonstration or by reference to a briefing aid.
Issue date:Air Transport Operations into One-way Airstrips: When the Operations Manual called for a particular missed approach procedure then the Operations Manual identify the physical feature to determine the missed approach point.
Issue date:He require an examination of the key personnel of airline operators on their knowledge of their regulatory responsibilities and of any special hazards associated with their operation as part of the Quality Audit of Air Transport Operators.
Issue date:Ensure that a standard approach path monitoring technique is prescribed, taught and adhered to.
Issue date:The provision of Area Forecasts and Aerodrome forecasts to general aviation pilots be reinstated.
Issue date:He review whether the standards for air transport operations from ALG's where a missed approach could not be performed safely from the runway threshold were acceptable.
Issue date: